Precision Wire Cutting Machine Standard Operating Manual

2025-04-16


Chapter 1: Operational Standards

1.1 Pre-Operation Preparation

Checklist Specifications Testing Tools
Power Supply 220V ±5% Multimeter
Cutting Wire Tension 0.15–0.25 N/mm² Tension Gauge
Coolant Concentration 5–8% pH-balanced Hydrometer/pH Test Strips
Grounding Resistance ≤4Ω Megohmmeter

Pre-Start Verification:

① Wear ANSI Z87.1-certified splash-proof goggles and cut-resistant gloves.

② Remove flammable materials within a 1m radius.

③ Conduct a no-load test run (≥3 minutes).

 

Chapter 2: Process Control

2.1 Standard Operating Procedure

Step Operation Guidelines Safety Alerts
Workpiece Clamping Use 3-point fixture (clamping force ≤80N·m) Never adjust unsecured parts manually.
Parameter Setup Select wire speed based on material hardness* Enable anti-electrolysis mode for copper.
Cutting Initiation Maintain 45° feed angle (initial speed ≤5mm/s) Emergency stop if abnormal vibration.
Process Monitoring Coolant flow: 2–3L/min Activate secondary cooling at >60°C.

*Refer to Appendix A for material-specific parameters.

 

Chapter 3: Emergency Protocols

3.1 Critical Incident Response

Fault                                         Action Plan                                                                  Containment Measures                     

Wire Break Alarm                1. Cut power                                                              Establish 10cm exclusion zone 

                                               2. Mark breakpoint

                                               3. Relieve tension before replacing wire
                                                                                                                                                                                               

Coolant Leakage               1. Activate backup pump                                              Cut power to affected area

                                              2. Deploy absorbent mats

                                              3. Inspect seals
                                                                                                                                                                                               

System Freeze                       1. Press physical E-stop                                                Do NOT force slider movement

                                              2. Backup programs

                                              3. Recalibrate after reboot

Chapter 4: Maintenance Schedule

Task                                                Daily                             Weekly                           Monthly                                 

Guideway Cleaning                          ✓                                                                                                                     

Bearing Lubrication                                                                 ✓                                                                             

Pulse Power Check                                                                                                           ✓ (Laser interferometer)

Precision Calibration                                                                                                        ✓                                      

Integrated with Wire Bending & Welding Systems

Wire Bending Machine Compatibility: Ensure tension settings align with downstream bending processes.

Wire Welding Machine Synergy: Maintain coolant purity to prevent residue interference during welding.

Cross-Platform Safety: Use identical ANSI-rated PPE when operating adjacent wire bending machines or wire welding machines.